What should be confirmed before fabrication?

Weld requirements and tolerances on the drawings, material grade and applicable standard, surface treatment (blasting / painting) and packing and shipping conditions.

What are EN 1090 and ISO 3834?

EN 1090 is the European execution standard for steel structures; ISO 3834 is the welding quality management standard. Both are held by certified factories, which produce under those systems.

What drives a CNC machining quote?

Material, tolerance class, surface treatment, batch size and lead time. Drawing completeness directly affects how fast and how accurately we can quote.

How do I choose a steel grade?

Balance the load environment (strength), corrosion requirement (coating or material) and applicable standard (GB / EN / ASTM equivalents). Send the requirement and we will help match it.

Which drawing formats work?

PDF, DWG, DXF and STEP are all acceptable; a 3D model further reduces ambiguity in communication.

How long is lead time?

It depends on process complexity and quantity. For standard steel structures and machined parts, a firm schedule is given once drawings and quantities are confirmed, with milestone updates during production.

Technical Articles

The details that actually cause trouble in vacuum fabrication, by topic

Controlling Welding Distortion in Vacuum Chambers

Most thin-wall chamber distortion comes from weld sequence and restraint. Symmetric welding, backstep, allowance and post-weld correction in practice.

Read more →

CF Flange Knife-Edge Machining

The knife edge is not a chamfer — it cold-welds the copper gasket. Face flatness, edge angle, protection and common failure causes.

Read more →

Vacuum O-Ring Groove Dimensions and Machining

Depth sets compression, width sets fill ratio, bottom roughness decides whether gas creeps through — inspect all three.

Read more →

Cleaning, Packing and Incoming Inspection

Dirty parts deliver oil and particles into your vacuum system. The cleaning sequence, packing practice and a five-point inspection list.

Read more →